Stormwater Management
Stormwater Management
Rowan University - Glassboro Campus Stormwater Management
What is stormwater?
Rowan University’s Glassboro Campus is located within the lower Delaware watershed. The Chestnut Branch, a key tributary of Mantua Creek, bisects the northern part of campus and eventually flows into the Delaware River.
To improve the quality of stormwater leaving campus and entering the Chestnut Branch and greater watershed, Rowan uses a variety of Stormwater Best Management Practices (BMPs) and Green Infrastructure Strategies, including, but not limited to:
- Bioretention Areas
- Wet Ponds
- Pervious Paving
- Green Roof
- Policies addressing waste and litter disposal and management
- Tree Plantings
- Monitoring and Maintenance
Rowan’s Glassboro Campus stormwater is also regulated by the New Jersey Department of Environmental Protection (NJDEP) under the MS4 R-11 Public Complex Stormwater General Permit. MS4 stands for Municipal Separate Storm Sewer System, which is a system of conveyances (such as storm drains, pipes, ditches, green infrastructure and catch basins, etc.) used to collect and transport stormwater. The R-11 refers to public complexes, including colleges and universities, that have their own stormwater management program. The intent to is to ensure strategies are being employed that improve the quality of stormwater entering the watershed.
Learn More: See the tabs below for additional information about Rowan’s stormwater infrastructure, best management practices, and associated policies.
For any questions, please contact: stormwater@rowan.edu.
Stormwater Supporting Documents
Stormwater Pollution Plan (SPPP)
The SPPP describes how we implement the stormwater program in order to meet the requirements of our NJPDES Municipal Separate Storm Sewer System (MS4) permit.
View the SPPP here: (link coming soon)
MS4 Outfall Pipe Map
MS4 Infrastructure Map
View MS4 Infrastructure Map here: Rowan MS4 Infrastructure Map
Watershed Improvement Plan (WIP)
The purpose of the WIP is to identify opportunities to improve water quality, reduce MS4 contribution of pollutants to waterbodies with impairments and Total Maximum Daily Load (TMDLs), and to address stormwater flooding to protect human health and safety, and the environment.
- Watershed Inventory Report:
View Watershed Inventory Report here: Rowan University Watershed Inventory Report
- Watershed Assessment Report:
View Assessment Report here: In process
- Watershed Improvement Plan:
Review Watershed Improvement Plan here: Coming Soon
Supplemental Policies
Stormwater Events: Public Education & Outreach
Watershed Improvement Plan Development, Public Meetings:
In accordance with the New Jersey Department of Environmental Protection (NJDEP) Municipal Separate Storm Sewer System Permit requirements, Rowan University hereby provides notice of a Phase 2 public meeting to inform the public and solicit input on the development of its Watershed Improvement Plan (WIP). These virtual meetings are open to the public and all interested parties are encouraged to attend. See links below for meeting information, for additional details, and to view the presentation slide deck.
Phase 2 Public Meeting – to be held virtually on:
- Monday, Lunch hour, 11/9 (noon – 1pm)
- Wednesday, Evening, 11/18 (from 6-7pm)
-
Teams Login and Dial Information, Agenda, and Additional Details Below:
*These meetings will be recorded and transcribed.
- Monday, lunch hour , 11/9 (from noon- 1pm
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/296500254392751?p=zeppARzNnuXJXQj2lw
Meeting ID: 296 500 254 392 751
Passcode: sc6eS9Nu
Dial in by phone
+1 856-594-2289,,155953689# United States, Berlin
Phone conference ID: 155 953 689#
- Wednesday, Evening, 11/18 (6-7pm)
Microsoft Teams meeting
Join: https://teams.microsoft.com/meet/28456668749082?p=oR4uIdGPSwZoKeKbvi
Meeting ID: 284 566 687 490 82
Passcode: YM73VV6T
Dial in by phone
+1 856-594-2289,,299718248# United States, Berlin
Phone conference ID: 299 718 248#
Purpose of the Meeting:
To share information about the development of a Watershed Improvement Plan (WIP), which is being created to:
- satisfy new NJDEP requirements
- reduce pollution and improve water quality entering the watershed overtime
This is a three-phase process, and the WIP development is currently in Phase 2.
Meeting Agenda:
- The meeting will include:
- Overview of Phase 1 and Why We are Here
- General assessment of the watershed
- Potential Improvements
Public Participation:
- Members of the public will have an opportunity to provide comments during the meeting.
See the following link for Phase 2 Watershed Improvement Plan for Viewing:
Rowan University Watershed Improvement Plan Phas 2 Slide Deck
Phase 1 Public Meetings were held virtually on 5/21( 6-7PM) & 5/27 (12 – 1PM)
See following link for Phase 1 Watershed Improvement Plan Presentation for Viewing:
Phase 1_Rowan Watershed Improvement Plan Presentation Slide Deck - Public Meetings
Additional Resources
Click on the links below to learn more about stormwater and get access to educational resources.